December 28, 2009 - throttle valve, various updates
|
Date: 12/28/2009
Size: 28 items
|
|
Engine with boiler jacket.
|
|
Pretty much everything in place here.
|
Clean plumbing.
|
|
Outside of oil pump and resovoir with linkage.
|
Inside of oil pump.
|
Blowdown valve assembly. End cap can be taken off the tee to assist cleaning.
|
Crosshead pump with painted mounting bracket.
|
|
Completed blast assembly.
|
Headlamp, I think from an Allen American. The casting is a bit lopsided but has been cleaned up a little.
|
|
Throttle valve assembly.
|